DDES provides interventoría (independent construction oversight on the owner's behalf) in Colombia: it represents the owner and makes sure the works are built to the agreed quality, schedule and cost, on public and private projects. It works from Barranquilla, with monthly reports, site minutes and quantity control.

Code
NSR-10
Deliverables
5
Coverage
Nationwide (Colombia)

What is interventoría (construction oversight)?

It is the control carried out by an independent professional, on the owner's behalf, so that the works are built according to the drawings, specifications and codes, at the agreed quality, schedule and cost. The NSR-10 defines the interventor as the person who represents the owner during construction, and includes quantity take-offs and administrative tasks in the role (A.13).

We represent the owner on site. We make sure that what was contracted gets built, to the required quality, on schedule and for the agreed price, on public and private projects.

How do interventoría, technical supervision and independent review differ?

Source: NSR-10 (A.1.3.7, A.1.3.9, A.13 and Title I), Law 400 of 1997 and Law 1796 of 2016.
Interventoría (oversight)Technical supervisionIndependent design review
What it controlsThe whole construction contract: quality, schedule, cost, quantities and paymentsThat the structure and the nonstructural elements are built according to the drawings, designs and specificationsThe structural designs: model, calculations and drawings
WhenFrom the start of the contract to its close-outDuring construction, before every concrete pourBefore the building permit is issued
IndependenceRepresents the owner before the contractorIndependent of the contractor (Law 400 of 1997, art. 37)Someone other than the designer, with no employment relationship with the designer
Is it mandatory?The NSR-10 does not require it: the owner or the contract decidesYes, if the lot allows more than 2,000 m² (Law 1796), and for occupancy groups III and IV whatever the area (A.1.3.9.1)Yes, if the lot allows more than 2,000 m² (Law 1796)
What it deliversMonthly reports, progress and quantity minutes, close-out reportRelease forms, materials control and a final report for the Certificado Técnico de OcupaciónComments report and signed review statement for the curaduría

The full guide is in interventoría (construction oversight) in Colombia.

Technical control
Slab under construction.Photo: Etienne Girardet / Unsplash

Technical control

Quality of materials and workmanship, compliance with the specifications, and approval of each activity before it is paid.

Administrative and financial control
Site meeting.Photo: ThisisEngineering / Unsplash

Administrative and financial control

Progress minutes, quantities, change orders and contract balance. Every month, the owner knows how much has been built and how much is left.

Handover and close-out
Infrastructure works under construction.Photo: Michael Myers / Unsplash

Handover and close-out

Acceptance of the works, insurance bonds, manuals and contract close-out. We close the project with no loose ends.

What is the process?

  1. Kickoff

    Contract, bonds and schedule.

  2. Follow-up

    Site meetings and monthly minutes.

  3. Control

    Quality, quantities and payments.

  4. Close-out

    Acceptance, close-out and handover.

What do we deliver?

  • Monthly oversight reports
  • Progress and quantity minutes
  • Schedule and budget control
  • Opinion on change orders
  • Close-out report
Construction oversight

Photo: Etienne Girardet / Unsplash

Frequently asked questions

How does it differ from technical supervision?

Technical supervision checks the structure against the NSR-10 and Law 1796. Interventoría controls the whole contract, with quality, schedule and cost, on the owner's behalf.

Do you work with public entities?

Yes. We know the reports and supporting documents that public contracts and oversight agencies require.

How often do I get reports?

A full monthly report, and meeting minutes every week or every two weeks, depending on the contract.

Construction oversight
Photo: Etienne Girardet / Unsplash

Last updated:

Contact

Do you need construction oversight for your project?

Tell us what stage your project is at. A DDES engineer replies with a proposal for scope and fees.

Our team works in Spanish. You can write to us in English and we will get back to you.

Photo: Julia Taubitz / Unsplash