Barranquilla · — Request a proposal

What we learn on site, explained briefly.

Photo: Michael Bader / Unsplash

The August 10, 2026 earthquake: what failed in Cali

Case study · 5 min

The August 10, 2026 earthquake: what failed in Cali

The buildings that collapsed were not built to the NSR-10. Flexible frames, older codes and a soil that amplified the shaking.

Read the note

Regulations: NSR-10 and Law 1796

The code explained for owners, builders and designers.

Interventoría in Colombia: what construction oversight is, what it covers and when it is required
Regulations · 6 min

Interventoría in Colombia: what construction oversight is, what it covers and when it is required

The interventor represents the owner and controls quality, schedule and cost. Technical supervision is one part of that work, and it is the part the law requires.

Structural design in Colombia: what it includes and what the NSR-10 requires for the permit
Regulations · 6 min

Structural design in Colombia: what it includes and what the NSR-10 requires for the permit

Who signs it, what the drawings and the calculations must contain, and in what order it is done.

One- and two-story houses: what Title E of the NSR-10 requires
Regulations · 5 min

One- and two-story houses: what Title E of the NSR-10 requires

Foundations, confined walls, openings and tie columns: the minimums for building an earthquake-resistant house.

Technical supervision under Title I: what it checks and what records it leaves
Regulations · 4 min

Technical supervision under Title I: what it checks and what records it leaves

The minimum scope of supervision, the log it must keep and the final certificate it signs.

Are there earthquakes in Barranquilla? What the NSR-10 requires on the coast
Regulations · 4 min

Are there earthquakes in Barranquilla? What the NSR-10 requires on the coast

The seismic hazard is low, but the design must also deal with the soil, the wind and the salt air.

Independent design review and technical supervision: how they differ
Regulations · 4 min

Independent design review and technical supervision: how they differ

One checks the paper before the permit; the other checks what is built during construction. Law 1796 requires both.

Certificado Técnico de Ocupación (CTO): what it is and how to obtain it
Regulations · 3 min

Certificado Técnico de Ocupación (CTO): what it is and how to obtain it

Who signs it, when it is needed and why it depends on supervising the works from the first concrete pour.

Law 1796: when technical supervision is mandatory
Regulations · 3 min

Law 1796: when technical supervision is mandatory

Area thresholds, who can supervise and what the curaduría asks for.

Contact

Let's talk about your project

Tell us what stage you are at. An engineer replies with a proposal for scope and fees.

Our team works in Spanish. You can write to us in English and we will get back to you.

Photo: Julia Taubitz / Unsplash