Construction oversight of warehouses C10 and C11 through close-out, review of their designs, and design of warehouses C9 and C5.
What we did
- Construction oversight of warehouses C10 and C11 through project close-out.
- Review of the structural designs before construction.
- More than three hundred control documents: orders, quotes and bid comparisons.
- Management plan, construction schedules and site log.
- Structural design of warehouses C9 and C5, in 2026.



The works, month by month
Dec 2023
Survey of the existing roof, ultrasonic testing and slab demolition.
2024
Construction of warehouses C10 and C11: structure, roof, docks and mezzanine, with a monthly record.
Sep 2024
Watertightness tests.
Mar 2025
Aerial record of the finished warehouse.
Jul 2025
Record of the electrical installations for RETIE certification.
2026
Close-out of C10 – C11 and structural design of warehouses C9 and C5.
Checks and tests
- Review of the structural designs before construction.
- Ultrasonic testing of the existing concrete.
- Quality control of materials.
- On-site checks of plumb and reinforcement bar sizes.
- Watertightness tests.
- Quantities and progress valuations.
What each service included
Construction oversight (interventoría). We represent the owner: quality, schedule and budget on public and private projects.
Independent design review. Review of structural designs by others, required on projects of more than 2,000 m².
Structural design. Concrete, steel and masonry buildings designed to the NSR-10, from the first concept to the reinforcement details.