Which structural documents the curaduría asks for and who signs them.

Photo: Amsterdam City Archives / Unsplash

For a building permit, the curaduría urbana (the building-permit authority) asks for the geotechnical study, the structural drawings and the calculations signed by qualified professionals (A.1.3.2, A.1.3.4, A.1.5.2 and A.1.5.3). If the lot allows more than 2,000 m² to be built, it also asks for a statement from an independent reviewer. DDES prepares the design, supports the filing and answers the curaduría's comments.

Code
NSR-10, A.1.3 and A.1.5
Law
Law 1796 of 2016
Service
Design and review

What to have at hand

  • The architectural design, even a preliminary one.
  • The soil study or authorization to commission it.
  • Title certificate and the lot's zoning or land-use statement.
  • The total area the lot allows, to know whether Law 1796 applies.

How we solve it

  1. Review of the project and the soil study.
  2. Structural design with signed drawings and calculations (A.1.3.4 and A.1.5).
  3. Coordination with the independent review when the law requires it.
  4. Answers to the curaduría's comments until the permit is issued.

Who can sign the structural drawings?

The structural design must be done by a civil engineer legally qualified for it (A.1.3.4), and the drawings must come with design and calculation reports (A.1.5.3).

When does Law 1796 apply?

If the lot allows more than 2,000 m² to be built, Law 1796 of 2016 also requires an independent design review and independent technical supervision during construction. Check it on the Law 1796 page.

Frequently asked questions

Which structural documents does the curaduría ask for?

The geotechnical study, the signed structural drawings and calculations, and the independent review when Law 1796 applies.

What happens if the curaduría comments?

The designer answers them and adjusts the drawings. DDES follows that process until the permit is issued.

Can the independent reviewer be the designer?

No. The review must be done by a professional other than the designer and with no employment relationship with them.

Last updated:

Contact

Filing for a building permit?

Tell us the project and the area. A DDES engineer tells you what the curaduría will need.

Our team works in Spanish. You can write to us in English and we will get back to you.

Photo: Julia Taubitz / Unsplash